Preparing the rooftop00
Main Road, Pratapgarh, Pratapgarh, Rajasthan, 312605
Chapter 00 — first light

Your roof already gets the sun.
Now let it pay the bill.

On-grid rooftop solar for homes, shops, industries and farms across Pratapgarh and southern Rajasthan - designed, installed and serviced by SOLARNIX.

150+Rooftops powered
1.2 MW+Capacity installed
25 yrsPanel warranty

What can your rooftop save?

Enter your average monthly electricity bill - the estimate is instant.

-System size
-Saving / month
-Payback
See the full estimate
Free site surveySubsidy filed by usAVVNL net metering
Scroll to read
Today's numbers
AVVNL unit rate₹ 7.5
Generation in Pratapgarh4.5 units / kW / day
Rooftop cost₹ 55,000 / kW
PM Surya Ghar subsidyup to ₹ 78,000
Net meteringAVVNL approved
Panel warranty25 years
Tier-1 materialAdani, Waaree, Sungrow, Growatt
Own install teamElectrical work never sub-contracted
Subsidy supportPM Surya Ghar filed on your behalf
Local servicePratapgarh and the whole district
What we do

Complete solar solutions under one roof

From a 2 kW home system to a 100 kW industrial plant - design, supply, installation, net metering and maintenance.

How it works

From the first call to the subsidy in your account

Four steps, and our office handles the paperwork at every one of them.

1

Free site survey

We measure the roof, check shadows and your sanctioned load, and size the plant honestly - not to the biggest number we can sell.

2

Written proposal

A complete proposal with the bill of material, expected generation, savings, subsidy and total cost. Nothing hidden in the fine print.

3

Installation

Material delivered, structure and modules fitted, wiring, earthing and commissioning - by our own team, usually in 2 to 3 days.

4

Net meter & subsidy

AVVNL application, net meter testing and the PM Surya Ghar claim, followed up by our office until the money is credited.

Our work

Installations we have commissioned

Homes, shops, schools and factories running on SOLARNIX rooftops.

5 kW

Residential rooftop - Rao Nivas

Main Road, Pratapgarh · Residential · Jun 2026

5 kW on-grid system on an elevated GI structure. Monthly bill came down from Rs 4,600 to under Rs 400.

15 kW

Kirana & cold storage - Pratapgarh Mandi

Sadar Bazar, Pratapgarh · Commercial · May 2026

15 kW three phase plant for a grain wholesaler with a 5 HP cold room. Sanctioned load 20 HP.

20 kW

Adarsh Vidya Mandir

Chhoti Sadri, Pratapgarh · Commercial · Apr 2026

20 kW school rooftop under the net-metering scheme, commissioned during the summer vacation so classes were...

See all projects
Chapter 04 — what you save

Find out what your rooftop can save

Enter your monthly electricity bill and get an instant estimate - system size, savings and payback period.

Customers

What people with an SOLARNIX rooftop say

★★★★★

"Bill 3,800 se 250 rupaye par aa gaya. Subsidy ka poora kaam SOLARNIX ne khud kiya, mujhe ek bhi chakkar nahi lagana pada."

SM Sandeep MenariaPratapgarh · 3 kW
★★★★★

"Cold storage ka monthly bill 38,000 tha, ab 9,000 ke around hai. Installation ke baad bhi engineer regular visit karte hain."

RJ Rupesh JainSadar Bazar, Pratapgarh · 15 kW
★★★★★

"Site survey se commissioning tak sirf 11 din lage. Team ne roof par koi damage nahi kiya and sab kuch neat fit kiya."

SV Smt. Vaishali SharmaChhoti Sadri · 5 kW
Questions

Everything people ask before going solar

How much subsidy do I get under PM Surya Ghar?
For a residential connection the Government of India pays Rs 30,000 for a 1 kW system, Rs 60,000 for 2 kW and Rs 78,000 for 3 kW and above. The amount is credited directly to your bank account after commissioning and net-meter installation. Commercial and industrial connections are not covered by this scheme.
How much roof area is needed?
Roughly 100 sq ft of shadow-free roof per kW on a standard structure. A 3 kW home system needs about 300 sq ft. On an elevated structure the space below stays fully usable.
What happens to the electricity I do not use?
With net metering your extra units are exported to the AVVNL grid and adjusted against your consumption in the same billing cycle, so your meter effectively runs backwards during the day.
How long does the whole process take?
Site survey and design takes 2 days, material delivery 3 to 5 days and installation 2 to 3 days. Net meter installation depends on the AVVNL division office and usually takes 2 to 4 weeks after commissioning.
What is the warranty?
25 years performance warranty on modules (30 years on TOPCon), 5 to 10 years on the inverter as per make, and 5 years workmanship warranty from SOLARNIX. The first 12 months of maintenance are free.
Does solar work in the monsoon?
Generation drops during heavy cloud cover but does not stop. Pratapgarh gets its rain between late June and September; sizing already allows for it, and the surplus generated from October to May balances the year out through net metering. Rajasthan settles net-metering credits annually, so a strong March does make up for a wet August.

Ready to stop paying the electricity board every month?

Tell us your average bill and location. The site survey is free, and the proposal tells you exactly what the plant costs, what it saves and when it pays back.

Get a free quote